BPOM TTAC / GS1 DATAMATRIX

Will your packaging line be BPOM TTAC-compliant by December 2027?

Serialization, aggregation and line integration for GS1 DataMatrix delivered and run by one accountable team, from code to TTAC report. The window to choose a vendor and implement is 2026.

20+large pharma manufacturers
Since 2015pharma serialization
200+projects, all industries
Software + hardwarebuilt in-house
Deadline December 2027

The 2027 deadline is already shaping your 2026 budget

Indonesia is moving pharmaceutical traceability from basic identification to full authentication. Prescription drugs and biologics must carry unique GS1 DataMatrix codes with TTAC lifecycle reporting by December 2027. The window to select a vendor and complete implementation is 2026 — not later.

View all news
Why TraceWay

Compliance isn't just printing a code. The code, the line, the hardware, TTAC reporting and reconciliation have to work as one system.

Most projects split that across a software vendor and separate integrators. We deliver and own the whole chain.

Approach 1

Software platform

  • A platform and a TTAC connector
  • Hardware and line integration arranged separately by you or other suppliers
Approach 2

Local integration

  • On-site delivery and market knowledge
  • Without a productized platform or a ready BPOM TTAC country pack
TraceWay

One team, end to end

  • Our platform plus a BPOM TTAC country pack
  • Our own hardware: printing, vision, reject, aggregation
  • Brownfield line integration without stopping your plant
  • Delivered and owned by a single team
Solution architecture

Not a printer plus software — one complete system

Five layers we supply and deploy as a single project, configured for Indonesian regulation.

CORE

Platform

Code generation and management, event model, reconciliation, reporting, integrations.

L3 / TTAC

BPOM country pack

Indonesian rules, statuses, formats and the workflow for submitting data to TTAC.

HW

Hardware

Printers, vision, reject units, aggregation stations and operator workstations.

SETUP

Implementation

Line assessment, design, integration, FAT/SAT, validation and go-live.

SLA

Service

Support, integration monitoring, regulatory updates, incident handling.

Serialization. Unique codes at unit level.
Aggregation. Unit, case, pallet relationships, SSCC.
Label management. Templates and code placement for BPOM.
TTAC connector. Exchange with the state system, queues, retries.
Reconciliation. Produced vs. shipped vs. returned.
Validation. Rule checks before data moves downstream.
Reporting. Regulatory and operational visibility.
Line integration. Software to PLC, vision, reject, printers.
Rework, returns, recall. Controlled exceptions, traceability kept.
Project structure

One supplier owns the software, line integration and reporting

This section follows the newer structure while keeping the previous TraceWay navigation and footer patterns.

Delivery model

We supply the platform, the country pack, the hardware layer and the implementation scope as one accountable program.

1

Code & events

Serialization logic, event model, reconciliation and regulatory reporting.

2

Line equipment

Printers, vision, reject units, aggregation stations and operator stations.

3

Plant integration

ERP, PLC, packaging hierarchy and brownfield adaptation with minimal disruption.

Program roadmap

How the project moves

Step 1

Line audit and SKU review.

Step 2

Country pack and hardware integration.

Step 3

Factory testing and pilot run.

Step 4

Go-live, TTAC reporting and support.

Single owner

Less supplier fragmentation

  • One accountability chain
  • Fewer interface risks
  • Faster decision-making at go-live
Built for Indonesia

Regulatory fit

The implementation model is aligned to BPOM TTAC requirements and operational lifecycle reporting.

Proof, not promises

We didn't just pass a pilot — we run mandatory serialization at national scale, every day

TraceWay is the engineering arm of Original Group, founded in 2006. Since 2015 we have delivered mandatory pharmaceutical serialization at 20+ large pharma manufacturers, inside one of the world's most demanding national track-and-trace systems.

20+large pharma manufacturers
2015pharma serialization since
200+projects across industries
60+registered IP assets

We build both the software and the hardware — from device firmware (L1) to national-system and ERP connectors (L3–L4). One supplier owns the code, the line and the reporting, instead of a chain of subcontractors.

Experience reaches well beyond pharma. We fit production lines with industrial automation, retrofit running lines and support third-party equipment — decisive for brownfield projects where the plant cannot stop.

PharmaSupplementsDairyBottled waterSoft drinksAuto componentsPrinting3PL warehouse
How it works

From assessment to go-live — a clear path

Timing depends on line complexity, number of SKUs and aggregation design. A guide for a single line.

Weeks 1–2
1

Assessment & discovery

Line audit, SKU review, packaging hierarchy and data-flow mapping.

Weeks 3–6
2

Design & integration

Platform setup, country pack, hardware and ERP integration.

Weeks 7–10
3

FAT/SAT & pilot

Factory tests, pilot run on the line, operator training.

Weeks 11–12
4

Go-live & support

Production launch, stabilization, TTAC reporting.

Book a BPOM TTAC readiness assessment

Message Yunita directly on WhatsApp, or send the form — we'll map your line, SKUs and timeline to a clear compliance plan.

For pharmaceutical manufacturers, CMOs, importers and marketing authorization holders in Indonesia.